Read the Building Handover Alongside the Boiler Records
The project handover shows which areas received new roofing insulation, wall insulation or glazing and when that work was completed. Use it to identify the first operating period that represents the improved building. Record any changes to heating hours, controls or occupancy made at the same time. A later burner trend may reflect several changes made under one contract.
The installed boiler capacity may still be the same. For a practical comparison, imagine a two-storey commercial building where the offices on the top floor previously needed the heating system to supply more heat during cold periods. After a roof insulation project, those rooms can require less heat to stay at the same temperature. The effect on the boiler depends on what else shares the circuit and when it calls for heat. A service at the opposite end of the building may still impose much the same load. The survey should consider the building’s total requirement where those services coincide as well as quieter periods.
It helps to map the report from the fabric project to actual operating dates. A block of offices may have been largely empty during the work and brought back into use a floor at a time. The lowest gas readings from those months could reflect a partly empty building. For a forecast, use data when the improved space is back in its intended use, and record any temporary arrangements that lasted into that period. A short span of dependable readings with clear occupancy and meter scope can be a better starting point than a full year whose conditions are poorly understood.
Where a project was handed over in stages, choose the comparison period for the part of the site the boilers actually serve. Suppose the occupied front wing was finished in September and the rear wing remained under construction into December. If both share the same boiler plant, autumn readings may still reflect the temporary conditions in the rear wing. Mark each completion date and check when the full circuit returned to its normal duties.
What Changed in the Burner’s Working Day?
Ask for a boiler trend covering several types of working days. A colder day can show whether there are periods when the plant has to run steadily to satisfy demand. A milder day can show what happens once the building is warm and only modest heat is required. In both, look for when the burner is actually firing, which boilers are available, and whether the circuit serves loads that continue outside space-heating hours. A fresh trend is particularly useful if the previous boiler review took place before the building improvements.
With more capacity available relative to the load, the boiler may reach its water temperature target quickly. If it regularly stops and starts again at light load, there may be scope to use the heat already in the water for longer between firings. If the controls allow the burner to run steadily across most of its schedule, the opportunity may be smaller. Use each observation to decide whether a further assessment is warranted.
Optiburner is a commercial boiler retrofit that manages burner timing. When the heat in the circuit can continue to serve the load, the optimiser can allow a longer interval between starts. The manufacturer describes how the unit monitors the temperature of the water leaving the boiler and allows firing to resume if the system needs heat. The opportunity comes from reducing unnecessary firing when the building requires less heat. In a post-works assessment, note what acceptable service looks like in the parts of the building that benefited from the fabric works and those that did not.
Compare the trend with the building’s operating record. Confirm when staff expect the heating to be available and check room temperatures where readings exist. Pay particular attention to areas with different hours or which were outside the fabric project. If warm-up times changed when the building reopened, ask what adjustments have already been made and note the dates.
Recalculate the Gas Available to Save
A lower gas baseline changes the value of a saving, even when the burner trend suggests more opportunity to refine its timing. Identify the most representative post-works boiler gas consumption in kilowatt-hours and record which dates it covers. If the meter serves more than the boilers, document what gas can be attributed to them and the evidence behind that estimate.
Put a value on the reduction the site needs to justify a closer look. In an illustrative example, an estate team wants to know whether further boiler optimisation could avoid 20,000 kWh a year. At a hypothetical consumption rate of 7.2p per kWh, that would be worth £1,440 in annual fuel costs. The boilers had used 300,000 kWh a year before the building works. At that level, hitting the target would require a reduction of about 6.7%. If the current annual boiler baseline is 240,000 kWh, the same 20,000 kWh target now calls for about 8.3%.
Those percentages are thresholds to discuss with an assessor. A better-insulated building might give the boiler more intervals in which to use retained heat, with less total gas available to save over the year. Reviewing the updated gas baseline and the firing trend together helps you decide whether the desired reduction is plausible. Check that the unit rate values the fuel saved on the applicable part of the gas bill. Standing charges belong in the overall gas budget.
Keep the Two Stages Visible
One way to record the project is to keep three dated figures: a pre-works baseline, a post-works figure before optimisation, and a further review after optimisation, if installed. Keep the equipment scope consistent and record weather, occupancy, schedules and any further measures that affect comparability. Each figure then has a clear job. The pre-works record gives context for the building project. The post-works record sets the starting point for assessing further savings. The later review provides evidence about the additional measure, if the comparison period supports that conclusion.
Review whether the boilers available to meet the load were the same in all three periods. During a refurbishment, one unit may be kept off for access, or another may temporarily serve more of the building. A change in the number of boilers operating can alter a firing trace even within one heating programme. Record the available plant and the fabric improvements so the assessor can interpret that difference.
Where work overlaps, be precise about what the records can resolve. New windows might be installed over several weeks while the controls engineer is moving to a new heating programme. The next bill might help show how the improved building performed overall. If the project team needs to attribute savings to a specific measure, agree in advance how to collect evidence for that measure and identify a period of settled operation. The two-sided comparison in the Optiburner Savings Report explains what changed in burner operation with optimisation in and out of use. Use gas meter data to assess fuel consumption for the equipment it covers.
Keep valve and fitting insulation on a separate line in that record. Building insulation changes heat loss through the fabric. Insulating a fitting changes heat loss at the component. The St. James’ Park case study records insulation of fittings as a separate measure alongside boiler optimisation. The same principle applies when a project spans both the building and the plant room.
What If the Work Has Only Just Finished?
A team taking back a refurbished building in spring may have only part of a heating season on the new baseline. Treat those first gas readings for what they cover. They can be enough to begin a discussion about the plant if you also have a record of its behaviour and the work completed. It may take observation across a wider range of conditions to refine an annual estimate. Note what the evidence shows today, and which assumptions you expect to revisit when colder weather gives the team a better view of how the plant handles higher demand.
A weather comparison can help decide which records to carry forward. If the pre-works trend was captured during a cold spell and the post-works data comes from a mild autumn, a difference in starts could reflect both conditions. Pick observations under comparable outside temperatures and occupied hours where possible. If you only have a mild-period comparison, limit the initial conclusion to that kind of day and schedule a check under heavier load.
If several properties received the same fabric work, pick the operating records that actually describe each building. Similar work can have different implications when heating schedules, boilers, or boiler-served services differ. Carry the engineering question forward to each site and value any opportunity against that site’s gas use. The Optiburner contact FAQ identifies boiler size, use and the building’s insulation as factors that affect the savings. A shortlist based on actual operation gives the site assessment better information than a shortlist based on the size of the fabric project.
Decide what improvement would matter to the site before the next meeting. It might be a meaningful further reduction in gas use while the occupied rooms stay at their required temperatures, or enough evidence to rule out a retrofit for the moment. Ask the team to bring the works completion date, the latest usable gas figures, and the burner trends showing the changed pattern. A post-works assessment has a clear starting point when everybody can identify which building and which boiler operation the numbers describe.
Where the new baseline is provisional, present a range of fuel volumes and identify the operating records that would narrow it. That gives finance a usable estimate for the next discussion while the estates team builds a more representative picture of the renovated building.
Assess Your Boiler Plant After the Fabric Works
Use the completion date of the building work as the starting point for a discussion with the Optiburner team. Describe the areas improved and share a firing record that shows how the boilers now operate. This gives the engineer a basis for deciding whether a site assessment would help establish further fuel-saving potential.