What Should a Commercial Boiler Optimisation Quote Include?

Know what to ask for in a commercial boiler optimisation quote, from the boiler scope and gas savings to costs and handover.
What Should a Commercial Boiler Optimisation Quote Include?
Podcast episode for this blog

Check Which Boilers and Measures the Quote Covers

Begin with the asset numbers. Where a plant room contains three boilers and the quote covers two, ask which two and what they serve. The answer will help you check the fuel calculation, the installation plan and the scope of the performance review. A plant description by brand alone is a poor guide when several units have similar model numbers or one of them supports a separate circuit. A marked-up asset schedule can resolve that uncertainty before the proposal goes to approval.

Ask what the assessment found about the existing system. You want to know which boilers are compatible, what duties they serve, and where the installer identified scope to reduce gas use. A site assessment for Optiburner checks boiler and heating-system compatibility. Its product description explains that the unit manages when the burner fires. Where the water in the circuit can continue to meet demand, a longer interval between starts can reduce unnecessary firing. A useful quote makes the relevance of that principle to your own plant clear.

Look for any work that sits beyond fitting the optimiser. A proposal may include insulation on valves and fittings or assume that the site will complete separate work before the installer arrives. Make sure each item has a description, an owner and a place in the price. If the quote covers just one building on a larger site, check that its stated savings apply to that same building and to the measures actually being bought. A project title can stay broad while its equipment and costs are tightly defined.

‍

Trace the Estimated Savings to the Fuel Records

Ask the supplier to show the baseline to which the estimated reduction applies. You need the consumption in kWh, the dates it covers and the equipment it includes. A dedicated boiler meter may provide that baseline. On a shared supply, ask how the boiler share was estimated and what readings would improve it.

Check how the reduction itself was selected. A figure drawn from a site assessment, a short firing test, and a financial forecast each has a specific purpose. A proposal can use all three if it describes each on its own terms. For instance, an observed change in burner operation can support the case that there is an opportunity at the boiler. A forward gas-saving figure needs its own assumptions about fuel use and the conditions the boiler will face. Ask whether the assessment covered an ordinary period for the site or one with unusual occupancy, heating hours or plant availability.

Next, check how the quote values the estimated kWh saving. Ask for the unit rate and the fuel volume as separate figures so finance can reprice the estimate at its current tariff. Check that the saving applies to the consumption charge and that the proposal uses a consistent VAT basis. Where the rate comes from a previous contract, show the cost assumption you expect to use for the budget.

‍

Test the Payback Assumption

One discussion with finance can establish the minimum improvement the site needs. If the proposal only works at a relatively high savings assumption, ask for the net annual result at a more cautious level. Have the team agree which charges are incurred once and which recur. It is easier to compare competing proposals when the fuel assumption and the treatment of recurring costs are visible beside the result.

Here is an illustrative way to read the numbers. A proposal would cost £7,200 upfront, with estimated annual gas-cost savings of £4,600 and recurring project costs of £600 a year. The estimated annual net saving is £4,000, and the simple payback on that basis is 1.8 years. If the support package quoted for the same installation cost £1,000 a year instead, the annual net saving would be £3,600 and simple payback would be two years. The fuel assumption stayed the same. The change in the ongoing commitment could affect the approval decision. These figures are an example only, with all costs on the same tax basis.

A full-year estimate describes a year of operation on its stated assumptions. If the equipment will be commissioned partway through the heating season, the actual savings in that financial year may be smaller. Ask for the assumed installation date and, where the data allows, reflect the month's normal share of fuel use when preparing the first-year budget.

‍

Separate the Installation Price From the Handover

A provisional item deserves a separate amount or a clear condition on the price. If the supplier will confirm access costs after the survey, record whether the current total includes an allowance for them. Ask for the updated price before the purchase is approved. That keeps an uncertain cost out of the agreed payback until there is a shared figure to use.

Find out what the contractor will do on site and what you need to arrange. Ask which costs cover supply, fitting, testing and handover, and which depend on survey findings. Check who will agree the working window and arrange plant room access. If other boiler work needs to happen first, have the quote identify the dependency so your team can plan for it. Optiburner’s published terms set out requirements for working boiler plant and suitable access, and specify accredited engineers for installation, configuration and support.

Ask the author of the quote what documents will arrive when the work is complete. For Optiburner, the published terms refer to a safety certificate for accredited installation and set out warranty and maintenance conditions. Confirm in writing which terms apply to your proposal, what service is included and how any later visits will be charged. Check where responsibilities sit for the existing boilers and for the new units. These particulars matter when a new contractor takes over the building or when facilities needs to reach someone about an operating issue.

A handover can also establish who holds the asset information and where it will be kept. In a large company, procurement may have the signed quote while the team working on the boilers only receives a work order. Ask for boiler and unit details to carry through to the completion records and for the person who runs the site to be included in handover. The future service team should be able to establish which equipment was optimised and where to obtain specialist support without having to reconstruct the order.

‍

Put the Performance Review Into the Proposal

Ask what evidence you will receive after fitting and when the parties expect to review it. The Optiburner product page describes a downloadable Savings Report built from comparisons of burner operation with and without optimisation. That information can help explain changes in firing. If your approval depends on the actual gas consumed, agree what meter data will be gathered and how they will be compared for the plant covered by the proposal. It helps to make the agreement while the initial consumption readings are still available.

Set the review against a clear description of the service to be maintained. For a leisure site, this could mean the expected opening hours and hot water service. A warehouse office may need an agreed temperature when staff arrive. Have the supplier and the site name the records that will help confirm the boiler served comparable needs during the chosen period. Include any planned changes that could affect the result. A new occupant, an altered schedule or another change in the plant room could all affect a comparison of gas readings.

The reporting question is particularly useful when a quote includes more than one measure. If the proposal describes a single project saving, check whether it can also provide evidence for the burner changes. Ask what evidence will help identify the contribution of separate work. The answer may affect how you schedule the works or which readings you collect beforehand. A quote that sets out how a result will be assessed gives the site a better starting point for asking whether the expected budget saving has materialised.

Ask which results would trigger another review. For example, the supplier may see fewer burner starts while the first comparable gas readings sit close to the original baseline. A proposal can say who will review that evidence and what operating information will be available. Agreeing the review in advance gives both sides the same basis for interpreting the result.

Agree a first review date and name the people responsible for the evidence. Specify who will bring the meter readings, who will provide the report and what the team will do if the period gives too little comparable data. Those commitments give the organisation a way to follow up when several teams share the work.

‍

Put Competing Quotes on the Same Page

Copy the assets, installed cost, ongoing commitment, annual fuel estimate and review method onto a single comparison. One supplier may have priced both boilers feeding a circuit while another has priced a single unit. Another may have included a wider measure or used a different tariff. Clear up those differences before comparing the prices and paybacks. If the team agrees on the same scope and gas-rate assumption for the final comparison, meaningful differences in the proposals are easier to see.

Check that both suppliers use the same time basis. One quote may show gross savings for a full year, while another gives the net amount expected in the first financial year. Record each as quoted and calculate any comparison on an agreed basis. The difference can otherwise look like a difference in heating performance when it reflects timing or the costs included.

A quote is ready for that discussion when one person can explain the installation, and another can reproduce the savings estimate from the information it contains. Give each a chance to challenge the proposal. A boiler engineer might ask what the assessment established about the controls. Finance might ask whether ongoing costs are included in the calculation. If the answer depends on work still to be done, add that item to the decision record with an owner. The eventual approval should refer to the version of the proposal that contains the terms and savings assumptions you assessed.

‍

Prepare for an Optiburner Quote

Before requesting a quote, assemble the plant list, gas records and details of any other work scheduled for the boiler room. Discuss the proposed scope with the Optiburner team and explain what evidence your organisation will need to approve the work.

Use the Fuel Savings Calculator to prepare an initial estimate from the gas used by the boilers you are considering. Bring it to the quote review and ask which assumption has the greatest effect on the projected annual saving.