Read the Rota in the Plant Room
Start with a printout of the new working week and compare it with the available boiler and heating records. A production rota tells you when staff and lines are scheduled. An estates diary may add early cleaning, late maintenance and weekend access. The heating programme tells you when the system is permitted to operate. Looking at all three can explain an apparently idle hour during which the boiler still has a legitimate job.
At this factory, the heating needed around the handover depends on who remains in the building. The line-cleaning team may still use hot water, and the adjoining office may keep its usual hours. A single boiler bank can serve both. Mark when each service needs to be available and ask production and facilities staff which rota changes affect their areas.
Check whether the new rota has changed which parts of the building are occupied, as well as when people arrive. A late shift that uses only one bay and its welfare facilities can have a different heat requirement from a day shift using the whole site. Mark both on the same site plan. This helps the energy manager ask about the boiler duty created by the new shift without guessing from production totals.
A site taking on a second shift has the opposite change to consider. Heat once needed for a few hours may now be required into the evening. The gap between shifts might be short and busy, with cleaning or maintenance to fit in. There may also be a genuine quiet period after the last crew goes home. Optiburner’s manufacturing guidance describes the different heat demands a factory can place on its boilers. Confirm which loads the proposed boilers serve before using a production schedule to predict their gas use.
Put a Time Against Each Change
Lay out a representative day from each rota on a timeline. Mark occupied heating hours, the production shifts and any interval with a different heat demand. Add the available record of actual burner activity. A boiler enabled for four hours may fire for only part of that time. If the control trend shows just the enable signal, ask the site’s heating engineer whether a separate firing record is available.
The period between crews deserves particular attention at this factory. Short burns can occur while the boiler maintains the hot water service between draws. They may also coincide with a space-heating programme still serving empty areas. Ask the teams using those spaces what happens during the gap. Heating hours are worth reviewing where the programme has outlasted its purpose. Continued cycling during a genuine heat requirement can justify a closer look at the burner.
Record the days when the pattern has temporarily changed. A shift brought forward to meet an order, a bank holiday shutdown, or weekend cleaning may explain a rise or fall in gas consumption. Treat these days according to how often you expect them to occur. A factory that will routinely run Saturdays needs those hours represented in its next forecast. An exceptional Saturday in a short observation period deserves its own note.
Give each shift in the revised schedule a status. A permanent Saturday shift belongs in the core operating assumption. A trial night shift can go into a separate forecast until production confirms it will continue. Where the site can identify the boiler gas used on those shifts, assess both schedules with their own fuel baseline. That lets finance update the forecast when the trial changes without revising every other week in the model.
Use the same time window for the records you are comparing. An overnight gas reading that covers the end of one shift and part of the next can conceal the very interval you are investigating. Where the site can review shorter periods, separate the busy operation, the changeover and the quieter hours. If the gas record is only daily, mark the operation on that day and use the burner trace to see which part of the day changed.
A production diary can also resolve apparent contradictions. On one trial shift, a line may have been down for most of the evening while staff remained on site. Gas use can still include space heating and hot water for that crew. Set that date beside a fully active shift and discuss which changes in demand the boiler could have seen. Where the line's gas use is separately metered, keep that record alongside the heating data.
Why Quiet Periods Are Worth Watching
The same plant can run steadily while the factory is busy and cycle more often during a long lull. When the burner stops, useful heat can remain in the circulating water. If the system can keep delivering the heat needed, an Optiburner boiler optimiser can extend the interval before the next firing. Fewer starts and a change in the length of individual burns can reduce the total time spent firing. The product monitors water temperature and responds if the system needs heat again.
A shorter production day may leave fewer hours in which the boilers operate at all, while a longer one could extend the time they run steadily under load. Both changes can alter the amount of low-demand time in the heating programme. Check the new burner pattern and the volume of gas it represents before assigning a saving to the revised timetable.
Rebuild the Gas Estimate Around the New Week
Separate the gas used by the boilers in scope from other factory gas use. Use a dedicated boiler meter where available. On a shared supply, ask what else is connected and what evidence can support a reasonable estimate of the boiler share. An increase in gas use from unrelated production equipment belongs in the site’s energy accounts. Applying a boiler savings percentage to the whole site’s gas bill can obscure what happened in the plant room.
For an existing Optiburner installation, compare current records with similar operating periods and use the recorded boiler activity to explain unusual days. The product’s downloadable Savings Report compares burner operation with and without optimisation and records how firing behaviour changes. The gas meter answers the separate question of how much fuel the equipment on that meter used. Use the two together with the rota and the site’s service records. Ask whether occupied areas remained at their required conditions and whether hot water or other boiler-served duties were comparable.
A proposed installation may have little data under the new arrangement. Where that happens, scope the boilers and agree what would make a useful first observation period. The date the new rota took effect and a note of which duties moved are already useful. Add recent gas readings or bills, which boilers they cover and any available firing records. A complete set of records for the previous working year is useful for context. A few representative weeks under the new schedule can clarify timing changes before the site commits to an estimate based on old patterns.
An illustrative example shows why correcting the fuel baseline matters. Suppose the annual estimate for the relevant boilers was 420,000 kWh under the old rota. After assessing the revised operating pattern, the site uses 350,000 kWh as its provisional annual boiler baseline. At an illustrative saving of 12%, the old figure would imply 50,400 kWh of gas saved. On the revised baseline, the same assumption gives 42,000 kWh. At an illustrative consumption charge of 6p per kWh, the two opportunities would be worth £3,024 and £2,520 respectively. This calculation holds the percentage constant to show the effect of the changed baseline. A fresh assessment may support a different percentage too.
If the new shifts begin in October, the next twelve months of invoices may give finance a useful view of the revised operation. The financial year in which the change was made may include a mixture of old and new hours. Date both assumptions, and show the kWh reduction separately so finance can value it at the applicable rate when the gas contract changes.
Review the Period You Expect to Repeat
Once the new rota has settled, arrange a review around a working week that the operations team recognises. Include the usual gaps and the usual start times. If outside conditions differ materially from your comparison period, record that difference. Take care with any savings based on a short trial during a season or a production run that accounts for only a small part of annual use. Record which observations helped establish the nature of the opportunity and which data support its estimated scale.
A short handover note can make the next shift change easier to assess. Record the difference in occupancy or services, the relevant dates, how those duties were reflected in the heating programme and what happened to the burners. Compare daily or weekly gas readings for the same scope. An engineer can then concentrate on the intervals that show the biggest change and check whether those periods represent heat that the building needed to deliver. Keep plant changes and revised operating hours with the consumption data so the reason for a difference remains clear six months later.
Agree who will update the estimate if the first month of the new pattern changes again. Production can confirm which shifts will continue, and estates can explain what the data shows about heating those shifts. This matters if a forecast made for a trial timetable is about to be used for a permanent arrangement. Put the agreed operating week on the estimate itself so the next reviewer can see what it represents.
At the example factory, the next decision turns on what the plant serves between crews. If the heating programme still serves empty areas, the team can review those hours. If the cleaning crew needs hot water, it can assess how the boilers fire while providing that service. Identifying both opportunities lets operations plan the work and gives finance a way to value each change on the fuel it actually affects.
Review the New Rota With Optiburner
A marked-up burner trend makes the new rota easier to discuss. Ask the Optiburner team to review it with you and share the shifts it covers, the boiler duties and the date the changes began. Point out which heating or hot water services must stay available when the lines stop.
For an initial indication of the possible bill savings, estimate your fuel savings using the best available boiler gas consumption for the revised operating pattern. Share the date the rota changed so the assessment can distinguish the new operating pattern from the figures you used in the previous budget.