Does Your Building Need a Boiler Optimiser, a Warm Air Optimiser or Both?

Follow the heat through a leisure centre to identify which equipment could benefit from boiler optimisation, warm air optimisation or both.
Does Your Building Need a Boiler Optimiser, a Warm Air Optimiser or Both?
Podcast episode for this blog

Identify the Hall’s Gas-Fired Warm Air Heaters

A large sports hall might use gas-fired warm air heaters mounted high above the court. A burner heats the exchanger inside each unit. A distribution fan passes air across the exchanger and sends it back into the space. The hall may need a warm-up before the first booking, followed by a quieter period between sessions. Ask the team which heaters serve the hall, which are enabled for each session and what the controls register as the temperature approaches its target.

Confirm on the plant schedule that the units supplying air have their own gas burners. Where the equipment is unfamiliar, bring the service records and unit model details to the assessment. The area can still feel cool if the heat collects above the occupied zone. Note where staff report this and at what point in the booking schedule. That information helps a survey connect the room conditions to the heater’s firing and to how the warmed air is distributed.

Two units that both deliver warm air into the building can belong to different systems. If a unit has its own gas burner, record the model and controls for a warm air heater assessment. If the air is warmed by water from a boiler, trace the water circuit and record the unit as a load on that boiler. This simple distinction prevents the centre from assigning the same fuel use to both categories.

The Optiburner warm air optimiser manages when the burner runs on a suitable heater. The fan can continue to move useful heat from the exchanger into the hall after the burner stops. When that retained heat is sufficient for the space, the heater can spend more time between firings. The engineer can check whether the hall reaches the required temperature and how the burner and fan behave through a representative set of bookings.

‍

Look at the Timetable Alongside the Controls

A hall with a school booking at nine, an empty spell after lunch and club sessions in the evening might have three very different heating patterns in one day. Include those changes when you describe the site to the assessor. Share which spaces the heaters also serve, how staff bring the hall into use before a booking and whether heating is governed by a local thermostat or shared controls. It is easier to interpret a string of burner starts when the person reviewing it knows what was happening in the hall at the time.

‍

Follow the Hot Water From the Changing Rooms

The boilers serving the showers may also supply radiators in the changing rooms or other parts of the centre. Hot water demand can rise sharply when a group leaves the pool together, even as a sports hall continues with a quieter session. Recording when each system serves a real load gives the assessor a clearer basis for investigating how often its burners fire and where there may be opportunities to reduce fuel use.

Ask what each boiler actually serves and when it operates. Find out whether one boiler plant serves the showers and space heating, or whether different boilers cover those services. If two boilers share a load, ask your engineer which normally operates and when the second comes into service. The answers will affect the scope of an assessment, particularly where a boiler also supplies parts of the building that are used throughout the day.

A boiler optimiser manages burner firing while the heating controls are calling for heat. It allows a suitable boiler to use heat already in the water circuit between firings, using fewer and slightly longer burns where conditions allow. The opportunity depends on how the boilers operate with the centre’s heating and hot water demands. The assessor can review whether the plant has room to reduce total burner-on time while supplying the required service through busy periods.

‍

Account for the Pool Where There Is One

A pool can add a significant, ongoing load with its own operating pattern. Establish which boiler plant maintains pool water temperature and check what supplies heat to the pool hall. Depending on the site, this may be a separate plant or part of a wider boiler system. Ask the pool operations team to identify busy periods and any changes that will affect the comparison, such as a closure for maintenance. Where boilers serve several loads, agree how they will be assessed and how continuing pool and shower service will be recorded.

On the way back to reception, check the rooms where the heat source is harder to identify. A small office could have radiators supplied by the changing room boilers, while a lobby could have its own warm air unit. A single sketch can link each area to its heat source and its meter. Group together rooms served by the same appliance and mark uncertain connections so the survey can resolve them.

‍

Decide Which Equipment to Assess First

At some centres, the hall heaters have long daily hours and account for a meaningful share of the gas supply. At others, most of the gas goes to boilers that serve showers, pool demand and several smaller rooms. Estimate the fuel attributed to each group before deciding where to begin. If only one group is in scope for the first phase, ask what information would let you assess the other group later.

Where there is a substantial fuel baseline for both systems, you can consider a joint survey. Bring the heating schedule and a list of the equipment, fuel and areas served. Include existing meter or submeter readings, and mark any consumption figure that has been estimated. An assessor can use those details to check compatibility, understand how the systems operate and identify where a trial would be practical. If the centre is open for classes most of the day, say when each area is accessible and which services are needed throughout.

A small activity area might see frequent heating complaints, while a well-performing pool may need little attention. Both observations matter, and each raises a different question. In the activity area, find out when comfort falls short and how the relevant equipment responds. For the pool, ask how much gas the plant uses and whether the burner records suggest an opportunity. The site may choose to lead with the group where the expected fuel savings and the evidence behind them are clearest.

‍

Estimate Fuel Savings for Each Heating System

Optiburner publishes typical fuel savings of 15–30% for commercial boilers and 20–30% for warm air heaters, depending on site conditions. Any estimate should apply to the gas used by the relevant equipment. If one meter supplies both, check whether submetering or operating records give you a defensible split. Mark any unknown share before you use the figures in a budget.

Take an illustrative centre using 660,000 kWh of gas over a year. Assume 180,000 kWh is used by hall heaters, 420,000 kWh by boilers and 60,000 kWh by other equipment. A 20% reduction in hall heater fuel would save 36,000 kWh. A 15% reduction in boiler fuel would save 63,000 kWh. Together, these assumptions give 99,000 kWh in potential annual savings, equivalent to 15% of the original gas used by the whole site. At an illustrative unit rate of 7p per kWh, the combined reduction in gas consumption charges would be £6,930 a year.

The hall heaters in that example use less gas than the boilers, so the higher assumed percentage produces a smaller saving in kWh. That comparison helps when reviewing where to start. If the gas split is still uncertain, look at how the result changes when a larger or smaller share goes to each group. Use the actual tariff to value the potential kWh saved, and keep any standing charges distinct from the consumption charge.

The worked example also gives the centre a way to test a phased plan. If it assesses only the hall in the first phase, the scenario covers 36,000 kWh. The boiler figure stays separate until that equipment is assessed. If both go ahead, check that the figures cover matching periods and distinct loads before adding them to the centre’s fuel forecast.

‍

Agree What a Successful Trial Would Show

For a hall, pick a point in the timetable when the heaters need to be ready for a session and choose representative places to check the temperature. For boilers serving showers or a pool, work with the operating team to agree how to record service during normal use. Pair those observations with burner records and gas consumption where available. Comparing similar periods helps the team see what changed in the equipment and how the building performed.

For example, a review could track the hall during a week of its usual evening bookings and use changing room observations during the busiest sessions. If one of those periods includes a tournament or a pool closure, record it and, where possible, make the next review comparable in operating conditions. With submetering, you may be able to track the relevant gas consumption directly. Where the main gas meter covers the whole centre, look at what the other equipment was doing over the same period.

If you plan to change both systems, decide whether to assess them together or in stages. A staged project may allow you to observe one change while the other equipment continues on its usual schedule. A joint assessment can be useful when records clearly show each group’s fuel use. Discuss the options with the assessor and choose a trial that gives your team a sensible basis for judging potential savings and the service delivered in each zone.

‍

Take the Heating Map Into Your Assessment

Use your plant sketch to ask the Optiburner team which equipment to assess. Tell the team which heaters have their own burners, what the boilers serve and where the gas metering is shared. That gives the centre a practical starting point for discussing suitability and how to observe each system without losing sight of the services it provides.

If you can attribute gas use to either group of equipment, use the Fuel Savings Calculator to explore its potential. Keep the hall and boiler consumption figures separate so you can see what each opportunity might contribute to the overall plan.