Why the Savings Change with Boiler Load
Take a commercial building whose boilers serve the same rooms on both days. On the colder day, the building loses heat faster, and the system may need the burner on longer to keep the rooms at their target temperatures. When the circuit needs more heat, there is less scope to wait before firing again. A boiler making long, sustained burns under heavy demand may have little avoidable firing for an optimiser to address at that point.
On the milder day, the same plant may reach its target more quickly and then cycle on and off as the water temperature rises and falls. During some of those off periods, the heat already held in the circuit can continue to serve the building. Optiburner monitors flow temperature and can extend the interval before the next firing while useful heat is available. It responds when the circuit needs the boiler to fire. The fuel-saving opportunity lies in the starts and total burn time the boiler can avoid while meeting the building’s heating requirements.
Weather supplies one part of the explanation. An early opening, an evening event or a larger draw on the hot-water system can add work for the same boilers. A building that closes early on a cold day can put a different load on the plant from a fully occupied building at the same outside temperature. Record the services and hours the boiler was covering before assigning a saving to that period.
The practical question for an estates manager is how frequently the plant moves between long burns and repeated shorter ones. If you can line up firing records with the heating timetable, you can often spot periods worth exploring with the engineer. Someone reviewing the investment can then ask how much gas the relevant boilers use under those conditions and whether the applicable unit rate makes the reduction worthwhile.
How to Take Two Days Into a Seasonal Budget
Together, the two illustrative days use 1,400 kWh before optimisation and offer a potential saving of 140 kWh. That is 10% of the combined consumption. The simple average of the two percentages is 11.5%. Applying it to the same 1,400 kWh would put 161 kWh in the forecast, 21 kWh more than the two individual estimates support.
The colder day carries more weight because it accounts for most of the gas. In a seasonal estimate, total the expected kWh saved period by period, then divide that total by the baseline gas use to report a single percentage. This keeps the projection tied to the consumption behind it.
The weighting also explains why a summer result, a shoulder-season result and a winter result each need their own consumption figure. If a summer boiler supplies only hot water, its percentage applies to the gas used for that service in the period covered. When space heating returns, the same plant may run for longer under a different load. Carry the summer result into the forecast as one line, with winter and the milder heating months on their own supporting assumptions.
At an illustrative unit rate of 6p per kWh, the reductions would be worth £4.80 on the colder day and £3.60 on the milder one. The combined reduction in gas consumption charges would be £8.40 for those two days. That figure values the fuel avoided at the assumed rate. Any fixed daily charge that remains payable belongs elsewhere in the bill. A site budgeting for more than one tariff can apply the relevant unit rate to each period before adding the pound values.
Choose Periods Your Meter Data Can Support
Use the shortest interval for which you have dependable and relevant gas figures. If you have monthly bills for the boiler plant, working by month may be sensible. A longer record of readings at a dedicated meter can make it possible to separate typical working days, weekends and holiday periods. Keep the model simple enough to explain and record how you built each gas figure. If a bill contains a corrected reading, use the corrected consumption in the relevant period where the account data lets you do so.
A site with uneven hours may benefit from separating the same month into two groups. Think of a venue that uses its main heating plant for ticketed events and runs a shorter heating schedule on other days. If the records support that split, compare gas use and boiler behaviour by type of day. You may find that the periods of greatest gas use leave little scope to change the firing pattern, while the hours with frequent starts account for a smaller share of annual use. Both observations improve a proposal.
Where a meter serves other gas equipment, establish what share of the recorded gas relates to the boilers in scope. For a site with one main meter and limited submetering, the next step may be a closer look at the metering arrangements with the facilities team. A high-confidence figure for the boiler plant is more helpful than a precise percentage applied to a total that includes other loads.
Match the calendar on the model to the readings behind it. A January invoice might include part of December, and a corrected reading can span several weeks. If you cannot split the gas total reliably, use the entire recorded period and describe what it covers. The daily illustration shows the method. At a real site, sound data for a longer interval gives a better starting point than day-by-day estimates inferred from one bill.
Carry the Same Assumptions Into the Forecast
For an initial forecast, multiply each period’s expected boiler gas use by its assumed saving. Record whether the assumption came from a site trial, an engineering assessment or an early budgeting scenario. A short trial can help identify which operating periods merit different values. Flag gaps in the high-demand data and state which observations would allow a more reliable estimate.
The gas use supporting the forecast should represent the building the business expects to run. A previous winter might include a wing that will now be closed, or a long shutdown the coming year will avoid. Account for those changes openly. A separate line for a change in hours or space in use makes it easier for finance to see whether a revised budget reflects changed service requirements or a different view of how much the boiler could save while delivering that service.
Where a Short Trial Helps the Decision
A burner comparison can show which operating conditions offer room for optimisation. In the downloadable Savings Report, Optiburner presents burner timings for the two operating modes. After a trial, review the services the boilers were supplying and how representative their firing was. Use meter readings for comparable conditions to quantify gas use on the relevant supply.
Take an illustrative school whose test runs across several mild days in October. The observed burners spend parts of the day cycling, and the trial offers useful information about those hours. If the school uses much more gas in midwinter, it could materially overstate the annual reduction by applying the same savings assumption to every month. The team could budget with a range for the high-demand periods pending more data. The same caution applies to a trial on the coldest days if those conditions represent only a few weeks of the heating year.
Use the trial to decide what you would measure next. If you only have relatively light-load observations, can the site retrieve a typical winter firing record? If a period looks particularly promising, how much boiler gas use does it account for? A good annual range puts the strongest evidence where it belongs and highlights the parts of the budget that still depend on assumptions.
One useful way to present the outcome is to show the three highest-consumption periods on separate lines. Beside each, state how closely the trial conditions matched the expected demand and whether a meter covers the relevant boiler plant. A reader can then see at a glance whether the proposal rests on evidence from the weeks that drive the bill, even if those weeks produce some of the smallest percentage figures in the workbook.
Give Finance a Sensitivity It Can Use
Once you have added the estimated kWh savings, price the periods at the rates your business expects to pay. An energy buyer can then change the rate independently of the fuel forecast. At a higher rate, each avoided kWh is worth more, while the amount of fuel expected to be saved stays the same if all operating assumptions are held constant. This makes it easier to update the proposal at contract renewal.
A second sensitivity can test how the project looks if the boiler has less room to improve in the high-use part of winter. For example, keep the gas consumption and unit prices fixed and reduce the assumed savings for those periods. The change in the forecast reveals how much of the projected return rests on performance when demand is high. That is a focused question to take back to an assessment, especially if it changes whether the project meets your organisation’s investment criteria.
For an illustration using the same two-day figures, assume the colder period can deliver 6% instead of 8%, and leave the milder day at 15%. The combined saving becomes 120 kWh, worth £7.20 at the same 6p tariff. The £1.20 difference shows exactly which assumption changed. Extend that comparison across the higher-use periods in the budget to see how much the project depends on the original estimate for heavy demand.
Keep the calculation with the final proposal so it can later be reviewed against the building’s operation. Record expected gas use, estimated kWh avoided and the unit prices behind the budget. In a later review, the same rows can show where the operating conditions and actual bill differed from the forecast. That gives the business something it can learn from, even when the year turns out differently from the one used to plan the work.
Put a Seasonal Value on Your Boiler Gas Savings
If the largest months drive your investment decision, discuss those months with the Optiburner team. Share the gas figures by period and flag where the existing boiler records cover a different level of demand. This helps focus the assessment on the assumptions that carry the greatest weight in your budget.
Use the Optiburner calculator to generate a starting estimate. Set it next to the seasonal calculation and identify which periods would need stronger evidence before you commit the figure to a budget.