Identify the Boiler and Test Conditions
Identify the boiler and confirm what it was serving during the comparison. On a site where several boilers share a plant room, you may have separate equipment records for space heating, hot water or different parts of the building. Attach the report to the corresponding asset record so anyone returning to the results knows which burner and circuit it concerns. The sample report groups unit and temperature information with timing and calculations.
The boiler optimiser compares burner operation with and without optimisation every 50 cycles, according to Optiburner’s product page. This allows a team to review the equipment's operation under the conditions it actually encounters. A count of 50 cycles represents a different duration on a boiler with frequent starts from one that fires less often. If the comparison period matters to your decision, confirm when the recorded activity took place and what loads the boiler was meeting.
Keep a short note beside the report. At a college, for example, the boiler could be supplying full teaching spaces one week and a reduced set of buildings the next. In a hotel, it might also be making hot water for a conference. Use the plant calendar or operating records to put any unusual demand in context. If you are comparing information from two boilers, begin by checking whether they perform the same job.
Read the Timing Fields Together
A complete boiler cycle includes a burn and a period when the burner is off. The Optiburner technical guide presents measurements of both periods, in seconds, with optimisation on and off. This is a useful place to start because a single burn can get longer while the boiler spends less of its operating period firing overall. You can see why when you add the cooling and burning times together.
Burning Time as a Share of the Cycle
The sample labels the proportion of a cycle spent burning with optimisation off as Doff and with optimisation on as Don. The guide describes the saving calculation as a comparison of those two shares, using information about the change in cooling time over the last 50 cycles. If you copy a result into a summary, keep the metric and unit beside the value.
For a simplified illustration, suppose a boiler fires for ten minutes and then remains off for 15 minutes. Burning occupies 10 out of 25 minutes, or 40% of the cycle. Now picture a cycle with 12 minutes of firing and 28 minutes off. Burning occupies 12 out of 40 minutes, or 30%. The second burn lasts two minutes longer, yet it takes up a smaller share of its cycle. The timings are illustrative and show how to read the percentages.
Here the difference is ten percentage points, from 40% to 30%. Relative to the starting share of 40%, it represents a reduction of one quarter in the share of time spent firing. Preserve that basis when sharing the calculation. A chart labelled “percentage of cycle spent burning” lets the next reader see exactly what the percentages describe.
You can see the same principle in the first row of the guide’s published sample. The existing cycle shows 974 seconds of burning and 1,569 seconds of cooling, so burning takes up about 38.30% of the cycle. With optimisation active, the burn is 1,290 seconds and the cooling period is 2,670 seconds, so the burning share falls to about 32.58%. This is an example of how to read the report’s timing fields. The sample figures by themselves give no metered consumption in kWh.
Firings Expressed Over 24 Hours
The sample also records the reduction in firings, expressed as cycles per 24 hours. Treat this as its own result. It helps an engineer relate the report to a practical change, such as longer intervals between starts. Read it alongside burn duration to see how the firing pattern changed.
When requesting a summary for colleagues, ask for both the number of firings and the burn-time metric, with the original units. Think of an example where the burner starts less frequently, and each burn lasts longer. The count alone leaves open how many minutes the burner was firing during the relevant period. A side-by-side summary gives the engineer room to explain both parts of the change.
Cooling Time and the E-Factor
The sample uses EC for the average E-factor, which expresses the extension of cooling times over the last 50 cycles as a percentage. Read it alongside the individual cooling and burning times. A longer interval before the burner needs to fire again can indicate that the circuit made more use of the heat it already held. The separate fields for firing time show what that change meant for the share of the cycle spent burning.
With several test results, look at the spread before choosing a figure to discuss. Two tests under similar conditions may tell a consistent story, while a third could include a different load or a longer period of sustained firing. Check the temperatures and timing with the person who gathered the evidence. A question about the difference between results can be more useful to the assessment than a summary that compresses them into a single percentage.
Where site staff keep several exports, leave each original row attached to its test so later readers can check where a figure came from. A row drawn from cooler conditions could be helpful evidence about operation at that load, even if its result is less striking. Keeping the records in context gives the team a stronger basis for choosing a follow-up test than selecting one result on its own.
Bring the Gas Meter In When the Question Is Fuel
The Savings Report gives you evidence about changes in the way a particular burner operates. The gas meter tells you how much fuel passed through that supply over a period. Use the two records together when you want to understand the equipment’s behaviour and quantify the fuel effect. A burner can run at different outputs at different times. If output changes, a reduction in firing minutes may translate into a different percentage reduction in kWh.
At Thorngate Churcher Trust Care Home, Optiburner reports fewer boiler cycles and an average 8.9% gas saving from daily meter readings during a three-week winter trial. The reduction in starts describes the change in burner behaviour. The meter readings support the gas result for the trial.
Give your meter readings the same care you give the report. Check what the meter supplies and whether the readings cover comparable conditions. If the whole building is on one supply, the meter might also record gas for a kitchen or a second plant room. A change in use elsewhere can affect the building total while the burner test remains relevant to the equipment you are considering. Check for an existing dedicated meter or ask the assessment team what would improve the estimate for the boiler it covers.
You can then value the estimated or measured kWh reduction at the applicable unit rate. For instance, if a separate assessment for the relevant boiler gas shows a reduction of 4,000 kWh in the review period, an illustrative unit rate of 6.25p per kWh would make that £250 in avoided consumption charges for that period. State how the gas figure was established and which tariff you used. When finance revises a budget at renewal, it can update the price without rewriting the engineering findings.
Summarise the Evidence for a Spending Decision
Someone who approves spending across several buildings needs a short explanation of how the report relates to the proposed work. Lead with the boiler and the service it provides. Give the test dates and conditions, then explain what changed in the firing pattern. Set any comparable gas figures alongside those observations.
State the basis of the gas estimate. If the boiler is separately metered, identify that supply and the period it covers. If it uses an assumed share of a building total, describe how the share was estimated. A colleague can then see which findings were observed at the boiler and which depend on budget assumptions.
Add a plain question for any unresolved difference between the records. If the burner data looks encouraging but site gas use has barely changed, check whether the boiler was serving the same loads, whether other equipment shares the meter and whether the periods compared capture the same hours. The resulting discussion may point to a longer follow-up review, or to a different way to isolate the relevant boiler’s fuel use.
It can help to add a clear outcome to that covering note. If the burner comparison is consistent but the whole-site meter is too broad, propose using an existing boiler meter for the next review if one is available. If the measurement period missed the busiest part of the operating week, agree a more representative window. Make the recommendation specific enough for someone to allocate the work and recognise when the evidence is ready.
When selecting follow-up data, choose conditions that matter to the site’s fuel budget. A short comparison during a quiet week can help explain how the plant responds at light load. A busy week may show whether that pattern persists when more of the building is in use. Keep both records with the report and describe their timing separately. Proper context makes it easier to decide where to investigate further and how much confidence to put in a projected saving.
If colleagues need an annual figure, decide how representative those conditions are before extrapolating. The boiler can spend different amounts of time at light and heavy demand during the year. Use fuel records to weight the expected contribution of the periods you are modelling, and describe any annual figure based on those assumptions as a forecast. This makes a site’s next review more useful because the team can return to the assumptions that most influenced the decision.
Discuss the Results for Your Boiler
To resolve an unfamiliar field or a surprising result, request a report review from the Optiburner team. Share the report, along with the boiler reference, the services it was supplying and the relevant gas readings. The team can explain the timing data and advise which follow-up would be useful.
At the planning stage, the Fuel Savings Calculator can give you a preliminary estimate. A subsequent test gives you evidence about the same equipment to revisit that estimate.