What the Boiler Trace Shows

If the site has a building management system (BMS), start with its boiler enable signal. This shows when the controls make the boiler available to provide heat. The burner-status record identifies when it actually fires. If the controls also record a firing-rate signal, ask the controls engineer whether it represents the rate requested or the rate achieved. That distinction determines what the percentage on the chart can tell you.

Follow one period when the building is asking for a substantial amount of heat. A modulating boiler can vary its output while the flame is on. Its controls can turn the burner down as the required output falls, within the equipment's operating range. Your trace might show a long stretch with the burner still alight and the rate coming down gradually. The boiler is adjusting to the load while staying on. That distinction matters when you look for the hours that may offer an opportunity to avoid unnecessary starts.

Now follow a quieter part of the day. The heating water might reach its target while the building continues to draw some heat. The burner can stop, then start again as the circuit cools. If that pattern repeats, the burner-status line will show separate blocks of firing. The rate line tells you something about each of those blocks. Together, they show how a modulating boiler behaves when the load drops.

Before counting starts, confirm how the trend was recorded. A graph with widely spaced samples can miss short burns or make several events look like a single run. Ask whether the controls log every change of burner state and whether the boiler and BMS records use the same clock. If the data cannot resolve individual starts, have the controls engineer identify a dependable event record for the period in question. A credible count matters when a reduction in restarts is part of the investment case.

‍

Which Restarts Warrant Investigation?

The clearest place to start is a set of periods where the boiler’s job is reasonably well understood. On a campus, that might mean looking at an occupied teaching block after its morning warm-up. On an office site, it could be the hours before most staff leave, when the building is still using its normal heating schedule. Mark the times when a hot-water load, a new heat request or a change in the plant schedule may explain a restart. Those annotations give an engineer a way to tell purposeful firing from a repeated pattern worth testing.

Look at the flow temperature around each cluster of starts. This is the temperature of the water leaving the boiler, and the trend shows how it changes between a stop and the next start. Read it alongside the services that were drawing heat. A sharp fall during a hot-water peak tells a different story from small temperature changes while the occupied parts of the building remain comfortable.

Compare the traces for any separately controlled heating circuits, too. If two wings open at different times, a step in the firing rate may coincide with a new circuit coming into use. Look at what happens after that step. The boiler may settle into a long, low fire or return to frequent starts once the extra demand has eased. The plant schedule gives you the likely reason for the step, and the traces that follow show the actual firing behaviour. Both views help the engineer choose representative periods for a test.

Look at more than a single day before assigning a financial value to anything you see. One afternoon can tell you where to investigate. A few representative periods help you understand whether the plant spends enough time there to make a material difference to its gas use. If it fires in long, steady runs for much of its operating week, the hours available for cycle savings may be limited. Frequent restarts through many lighter-load periods give the engineer a different proposition to assess.

‍

What Optiburner Changes on a Modulating Boiler

Optiburner is a retrofit that manages burner firing timing. When the heat already in the circuit can meet demand, it allows more time before the next burn. As the flow water cools, the device monitors temperature and responds when the plant needs to fire. On a site with a BMS, Optiburner describes taking the existing boiler enable signal and applying its own control logic to the firing sequence. What matters for a modulating boiler is the difference between adjusting output during a burn and deciding when another burn is needed.

Suppose the trace shows ten short stretches of low-rate firing during a period of light demand. An engineer would consider whether the circuit could continue using its hot water longer between those burns. A resulting pattern might involve fewer starts and slightly longer individual burns. Evaluate the change alongside the flow temperature and heating performance in the areas served by that circuit.

For a site that already tracks running hours, there is a useful change of emphasis here. Ask how many of the logged hours relate to enabled time, how many represent actual firing and where the rate signal sits during firing. If the log records only whether the plant was enabled, gather a better view before judging the opportunity. The extra detail can show whether a plant that appears to run all day is actually spending much of the occupied period switching its burner in and out.

‍

Why Burner Minutes and Gas Use Can Move by Different Amounts

Imagine two one-hour windows on the same modulating boiler. In one, the burner spends most of its firing time near the top of its range. In the other, it fires for the same number of minutes but spends more of them at a lower rate. The time totals match, yet the amount of gas consumed can differ. A reduction in burner minutes is a useful engineering observation. Metered consumption helps establish what it means for the gas bill.

The Optiburner Savings Report compares burner operation with optimisation engaged and disengaged. Ask for the time and conditions covered by the comparison. That information can help you relate a change in the firing pattern to the part of the day or the type of load where you expected to see it. If you need a gas figure for a budget or an assessment of the project, use a gas reading for the relevant equipment and period wherever the metering allows it.

For example, an equipment-level gas meter may serve the boiler under review. If so, make sure the meter dates and the trend dates line up before comparing the observations. Where the available meter covers several loads, establish what else was drawing gas over that period. List any other boilers serving the circuit, changes in occupation and occasional supplies such as gas cooking if they share the meter. A sizeable change in another use can make the whole-site figure a poor basis for valuing an individual boiler change. Ask the site engineer which readings give the narrowest reliable view.

Keep the firing-rate information with the raw export. If a dashboard shows a daily average, request the interval data for the periods you intend to compare. Averaging across idle time and firing time can hide the contrast between an enabled boiler at rest and one supplying heat at a low rate. Recording the available points and their meanings gives the engineer a firmer basis for deciding what the data supports.

‍

Give Finance an Estimate That Can Be Checked

Give finance the gas consumption for the equipment in scope and the dates it covers. An annual estimate needs a view of when the boiler modulates steadily, when it cycles and how much fuel it uses under those conditions. If your initial trend covers a few mild afternoons, state that explicitly. It can support an assessment of light-load behaviour and identify what you still need to observe at higher demand.

For example, imagine the metering team identifies 240,000 kWh of annual gas use for the boiler in scope, and the business wants to understand what a 10% reduction would be worth. That assumption gives 24,000 kWh saved a year. At an illustrative unit rate of 6 pence per kWh, the consumption charge would fall by £1,440. The scenario gives finance a figure to discuss and a way to test a lower or higher assumption once the engineer has reviewed the plant. Use the actual gas tariff for your own estimate and keep any fixed standing charge separate.

Set the post-installation review against the reason for fitting the optimiser. If the case rests on cutting repeated starts after the building has warmed, return to that part of the trace. Check how the restart frequency changed and whether the plant maintained the required temperatures. Then value any supported gas reduction over comparable operation. This ties the financial result to the operating improvement the project was designed to make.

On a bank of modulating boilers, record which units carried the load in each period. A boiler could show fewer starts after the work because another unit ran for longer. If your meter serves the whole bank, the engineer needs the other units' firing records to interpret that result. Put those records alongside the circuit temperatures. They help show whether the firing sequence improved while the bank supplied comparable heat.

The most useful record to share before a survey often includes a stretch of ordinary operation with the firing status, any available rate signal and the flow-water temperature on the same time axis. Add a sentence about what was happening in the building when the burner started cycling. A charity office during a normal afternoon, a teaching block after its first lessons and a venue between bookings place different demands on their heat supply. That context helps the engineer assess the firing pattern you actually have.

‍

Bring a Firing Trace to the Savings Discussion

A trace with a steady burn and a cycling period makes a good starting point for a modulating boiler assessment with the Optiburner team. Include the boiler model, the circuits served and the points the controls actually record. The team can review what those traces show and advise which readings would support an assessment of gas use.

Use the fuel savings calculator to put an initial value on the opportunity. Base the estimate on the gas consumption for the same boiler or group of boilers shown in the trace.