Follow the Heat Through the Heater
Picture a suspended gas-fired heater above a picking aisle. During a firing cycle, combustion heats the exchanger. The distribution fan draws air from the building and moves it across the hot metal, where the air picks up heat before passing back into the aisle through the outlet. Combustion gases leave through the flue. The hot metal links the part of the heater that burns gas to the air circulating through the warehouse.
When the burner cuts out, the exchanger cools gradually. Air continues to pick up heat as long as the metal is warmer than the incoming air. The outlet temperature falls as the exchanger cools, even if the fan sounds much the same. If staff notice the fan running and want to know whether the unit is still firing, the facilities team can compare the observation with burner records or ask its service engineer what indicates normal operation.
Think of the burner and the fan as having different jobs in a single cycle. The burner adds heat to the exchanger. The fan delivers heat from the exchanger to the air. A room thermostat may have reached its target by the time the burner stops during a normal shutdown, and the fan may still be completing its run-on. The duration and behaviour of that sequence depend on the installed heater and its controls. If a unit’s behaviour changes, ask your service engineer to check it against the normal sequence for that model.
How Optiburner Makes More Use of the Run-On
A room thermostat and a heater temperature sensor describe conditions in two different places. A thermostat near a packing bench responds to the air around it. The heat exchanger, several metres away in the heater, may still have useful heat to give up. With controls that rely on the room thermostat alone to decide when the burner is needed, firing can continue after the exchanger is already hot enough to supply useful warmth.
Optiburner is a retrofit that uses heater temperature to refine the firing cycle. It can stop the burner earlier and allow the distribution fan to carry heat from the exchanger while the room still needs heating. As the exchanger cools and the available warmth declines, the controller manages the timing of the next firing. The sequence lets a heater supply warmth during part of the call for heat using energy already stored in the metal.
This explains why fan run-on by itself tells you little about the savings available. Two heaters could each have a fan that runs after the burner stops, with quite different firing patterns. One might spend long periods firing before its normal shutdown. Another could use controlled pauses to keep delivering heat from the exchanger between shorter combustion periods. The records to compare are burner operation, heat delivered to the occupied area and the amount of gas the heaters use.
Discuss what the heater does over a representative shift with the service engineer. Identify which units are enabled, when they fire and whether their fans keep moving warm air during the gaps. Include a busy loading period and a steadier part of the shift. This shows how the heaters respond to changing demand and helps the engineer assess when the distribution fan is delivering heat left from an earlier burn.
A simple record might show that the burner stops while the fan keeps sending warm air into the packing area, and that the burner fires again only as that warmth tails off. For another unit, the records might show frequent starts and little separation between them. Label the heater and the time of each observation so the engineer can relate it to the local controls and demand. Timing a single fan run-on gives a snapshot. Watching several complete cycles gives a clearer picture of how often the heater can make use of stored heat during the shift.
Review what happens at the beginning and end of the run-on, if those points are already visible in the controls. If staff are recording observations by hand, coordinate the times with the engineer so the note about warmth from the outlet can be matched to the heater’s operating status. Several observations spread across the shift can show whether useful heat reaches the work area during the burner-off interval. This also serves as a practical check against what the team hears from the floor.
How Warm Air Spreads Through a Warehouse
A warm outlet is only the first part of the journey. In a high-bay warehouse, buoyant warm air can collect near the roof while the people picking and packing stock work in cooler air below. This layering is called thermal stratification. A tall rack can also influence how air reaches different aisles, and opening loading doors can change conditions near the bay while a more sheltered zone stays steady. For the facilities team, an outlet reading tells less about working conditions than readings in the places staff occupy.
Optiburner’s warm air guide illustrates this with temperatures measured at one and six metres above floor level in two spaces. The reported readings with conventional control were 22.0°C at one metre and 35.1°C at six metres, a difference of 13.1°C. The readings with optimised control were 21.6°C and 23.8°C, a difference of 2.2°C. Working-height temperatures were similar in the two spaces, even though the readings higher up differed by 11.3°C.
The example is useful because the difference between the upper and lower readings tells a story the working-height reading alone would miss. If your own warehouse has cold spots, map where staff feel them and when they occur. Note whether the issue is concentrated beside a delivery door, in the middle of a racking aisle or across the space. Ask your heating contractor to consider the layout, heater coverage, and temperatures at different heights when deciding whether better use of stored heat could help.
Consider a packing area that feels cool during vehicle movements and comfortable as soon as the loading doors close. Compare that area with a bench well away from the bays, and note whether the two are served by the same unit. The comparison gives the engineer a way to relate a heater’s firing pattern to the locations asking for warmth. It also makes it easier to agree which spots should be monitored if you go ahead with a retrofit.
What to Measure Before You Estimate a Fuel Saving
Begin with the gas consumption of the heaters under consideration. A site with a meter dedicated to warehouse heating has a clear starting point. Where other equipment uses the same gas supply, gather whatever records help estimate how much goes to the warm air units. A shared meter at a warehouse might include a boiler serving offices or another gas process. The heater fuel baseline sets the scale of the opportunity.
Write down the heating hours and the operating conditions behind them. A November week with extra dispatch shifts can be useful evidence of how hard the heating works, provided the extended hours are recorded. A control review may also reveal periods when one section of the building is occupied, and another is idle. Tell the engineer about any exceptional events, changes to shift patterns and recent building work. This helps when comparing the heater’s behaviour across periods with different demands.
Optiburner publishes typical fuel savings of 20–30% for warm air heating optimisation, with results depending on site conditions. If the heaters in scope use an illustrative 240,000 kWh of gas a year, a 20% reduction would represent 48,000 kWh. At an assumed unit rate of 5p per kWh, that is £2,400 a year in lower gas consumption charges. The arithmetic gives the team a way to size a potential opportunity using its own heater consumption and actual tariff.
Check the Gas Use and the Conditions on the Floor
Before proceeding with a retrofit, agree what would make the result useful to your business. A warehouse manager may care about conditions at the first picking bench at the start of the morning, while finance may need an estimate of gas avoided across the heated area. Pick a few representative occupied areas and agree with the facilities team how to record working-height temperatures. Keep notes on outdoor conditions, opening hours, and unusual use of the loading bays so a later comparison has context.
Plan the measurement around a place where staff work for a sustained period. Use the same positions, heights and parts of the shift for the later review. A spot check can be useful, especially if a complaint is tied to a specific task or delivery window. A repeated set of readings gives the manager more context if one result looks unusually high or low. Ask the engineer what else was happening at the time before using that result to explain gas use.
Ask how the engineer plans to record burner-on time and how it relates to the unit’s gas consumption. Optiburner’s warm air guide describes a downloadable Savings Report that compares cooling and burning times and records changes in burner-on time. Read those findings alongside meter evidence where available. For a wider energy cost assessment, consider fan electricity separately. Extra fan minutes and fewer firing minutes affect different parts of the site’s energy use.
During the review, look back at the occupied spaces you chose at the start. If the aisle near the loading bay remains cooler than the packing zone, the times of those readings can help relate the conditions to vehicle movements and heater cycles. Compare a similar sequence before and after the change when the records allow. Pairing an explanation of how the unit now fires with a picture of how the building feels gives both the operations team and finance a sounder basis for deciding what to do next.
Start With the Heaters Above the Working Area
Show the Optiburner team which heaters you are hearing and when staff notice the fans. The heater models, a basic floor plan and normal loading hours can help the team understand which units the observation describes and what a site assessment should check.
Use the Optiburner Fuel Savings Calculator to explore the scale of the opportunity once you know the gas the heaters use. If the same meter also serves the offices or another process, tell the team so the estimate can be based on the right equipment.