Which Boilers Should You Optimise First in a Multi-Boiler Plant Room?

Use load, firing patterns and fuel evidence to choose which commercial boilers to assess first for optimisation in a multi-boiler plant room.
Which Boilers Should You Optimise First in a Multi-Boiler Plant Room?
Podcast episode for this blog

List Each Boiler and the Load It Serves

Start with the plant schedule and walk through it with someone familiar with the building. For each boiler, record its identifier, rated output, location and the areas or services it supplies. Identify boilers that share a circuit and units dedicated to a single load. The schedule should show whether a unit heats occupied spaces, serves hot water or does both. If the available drawings are out of date, flag the uncertain connections for the survey.

Next, establish which units do the work at different times. Where one boiler leads the sequence, establish when the controls call for each additional unit. Ask whether the lead role changes during normal operation and how often. A snapshot from a single visit can show which boiler was leading at that moment but gives only a limited picture of the workload across a month.

Add the hours when the services are needed. At a leisure centre, the space-heating load on a mild afternoon may be modest even while showers are heavily used. At a school, a boiler bank might see a pronounced warm-up period before the first lesson and then operate at lower demand for much of the day. Document those patterns before deciding which days are representative enough to review.

Mark standby plant on the schedule. A large boiler held in reserve may consume relatively little gas during normal operation, even though it is essential when another unit is unavailable. Confirm which units need to remain available throughout the work. Give the assessment team both the high fuel-using boilers and any units whose repeated starts make them worth a closer look.

Where the lead boiler rotates, note the dates or conditions that trigger each handover. A week of trends may cover one unit acting as lead throughout the review. The following week could show how the same load is met by a different unit. Records from both assignments give the engineer a stronger basis for deciding whether a promising saving applies to one boiler or to the way the whole group is operated.

‍

Review What Each Boiler Does Between Heat Calls

Ask for records that identify actual burner operation if the building management system provides them. A boiler can be enabled by its controls for an afternoon, with several periods when the flame is off. It is useful to have the enable signal, firing times and available flow and return temperatures together for the same interval. Check which of those values the controller records and what each reading represents before comparing one unit with another.

Look at several types of days. Take a cold morning when demand is strong, a milder day when the building needs less heat and a period with significant hot water demand if the boilers provide it. Note the events behind any sudden change in the trace, such as a change in opening hours or a space-heating circuit coming online. A day with an unusual maintenance override deserves its own label.

Optiburner works on the firing pattern of each boiler it serves. The retrofit monitors flow temperature and can extend the time before the burner starts again when there is useful heat in the circuit and demand allows. The boiler can then fire fewer times, with slightly longer individual burns and less time spent firing overall. Existing building management controls continue to operate alongside the optimiser. The site assessment is where you examine how those controls interact on a particular plant.

A programme of observation can reveal candidates the asset schedule would have missed. For example, a smaller hot water boiler might fire briefly many times during the hours between busy periods. A larger boiler on the same site might sustain longer burns in winter and see little use in summer. Check how often each pattern occurs and how much fuel is involved before putting either unit at the top of the list.

‍

What the First Phase at St. James’ Park Showed

The stadium’s gas boilers ranged from Hamworthy to Hoval and together provided approximately 6,000 kW of capacity for heating and hot water. Reviewing one phase at a time gave the project a defined equipment group, even though units in the group served different demands. The case helps explain why a shortlist benefits from a record of what each boiler serves as well as its size.

Optiburner’s short-term test alternated the units in and out of circuit every 50 boiler cycles and compared burner cooling and firing times. The club received the downloaded test data a month after installation. The case study reports savings of 12% to 30% for those test periods, with higher results on water-heating boilers, which it associates with shorter cycles. For the first phase as a whole, it reports an average 16% reduction in gas consumption.

That difference between units is the useful point for a new survey. A hot water boiler merits a close look if its controls show regular short bursts of firing and it handles a meaningful share of demand. The periods between draws, the hours the service operates and the boiler’s actual response all affect the opportunity. Use the stadium’s results to guide what you observe at your site and develop a savings estimate from your own plant data.

The case also describes a separate programme of insulating 340 fittings. If your own first phase includes work on pipework or valves, record its scope and timing as well. This helps when you review which measures affected fuel use and when you decide whether the same work belongs in the next phase. The first-phase gas figure in the case study is reported for the optimiser installation. St. James’ Park case study

‍

Compare Boiler Gas Use and Potential Savings

Start with metered consumption for individual boilers or groups, where those records exist. A main site meter helps estimate the scale of the opportunity. For a phase covering only part of the plant, work out what the meter includes and how much of the total your candidate boilers are likely to use. Record how that share was estimated and consider whether better information would affect the order in which you tackle the work.

Keep each boiler’s rated output in the plant schedule. The rating describes its capacity. Its gas consumption depends on what it supplies and how it fires over the period under review. Two boilers can spend similar hours enabled and still do very different amounts of work. Ask the engineer what firing and output records can establish where a dedicated meter is unavailable, and mark any estimated values in the review.

Consider an illustrative comparison. A heating bank using 300,000 kWh each year would save 30,000 kWh at an assumed 10% reduction. A dedicated hot water boiler using 125,000 kWh would save 25,000 kWh at an assumed 20% reduction. The larger percentage in this example gives a smaller amount of fuel saved. The two opportunities are close enough that installation scope and confidence in the estimates could change which one the estates team assesses first.

Put a cash value on each proposed reduction using the unit rate for the relevant gas supply, then check the project costs for the same scope. Keep the percentage, estimated kWh saving and cost assumptions together so a reviewer can see why each option was selected. If the survey changes the estimated fuel use or the units in scope, recalculate the saving before agreeing which boilers go first.

Give each candidate a short reason for inclusion. A high annual consumption on a dedicated meter or frequent short burns on a year-round hot water circuit tell a reviewer what the survey needs to validate. If a unit is in scope because it shares controls with a lead boiler, record that as well. The notes give the team something to work from if a boiler’s duty changes before installation.

‍

Set Up a First Phase You Can Evaluate

Choose a group of boilers with a clear operating role and a way to review their performance. Sometimes that will be a whole bank with one set of controls and a shared meter. A boiler with a dedicated service and usable records can also be a sensible starting point. For either scope, document the areas served and any standby capacity that needs to be available while work is carried out. Ask the assessing engineer to check how the proposed work would fit with the existing control sequence.

Agree what the commissioning and post-installation checks need to show. The site may have set operating requirements for hot water or have spaces that need to be warm before opening. Identify who will check that those services continue to perform as expected. Compare conditions for similar periods and note changes in the building’s use, so a review of burner operation and fuel consumption has the context it needs.

Agree what you would need to see before moving a reserve unit into scope. Perhaps the first review shows how the lead boiler behaves during ordinary demand, while the standby boiler only runs during colder spells or planned maintenance. In that case, the first result helps identify when to observe the next unit. It gives the team a reason to schedule the next assessment under conditions that actually show the reserve boiler’s duty.

Compare firing patterns for the selected boilers in Optiburner’s downloadable Savings Report. It records how each burner operates with optimisation in and out of use. Collect the site’s gas and operating records as well, especially if several units share a supply. If a whole-bank meter is available, it may help show what happened across the group. Define the boundary in any report because the figure will apply to everything served by that meter.

Decide how the findings will influence the next set of boilers. For example, if the review shows that frequently used hot water units are the strongest candidates, inspect the other units serving that load. Check how their usage compares and whether the plant and controls are similar. If the first group changed only during mild weather, schedule a follow-up under a different load before assuming the same opportunity persists throughout the year.

‍

Turn the Plant Schedule Into a Shortlist

Have a candidate bank or individual boiler in mind? Ask the Optiburner team to review the proposed first phase. Include the plant schedule and any trends that show when the shortlisted units actually fire. The team can discuss which service conditions a site assessment should cover and how you could measure results for that group.